Project: Westfield Energy Centre, White City, London E.ON contracted HM to design, fabricate and install an exhaust system from the energy centre across the site and up a 70M tower block for dispursement. The system included 2 off 500mm dia CHP lines and 3 off 550mm dia boiler flues. A minimum 40 year life expectancy … Continue reading E.ON Energy Solutions

Project: SNF Chiller Plant Install August 2015 GEA contracted HM to install and fully pipe up a chilled water plant consisting of 2 BAC condensers, 2 off compressor packs and 2 off pump sets. The plant was free issued by GEA and HM was responsible for the lift and shift, incorporating the offload and positioning … Continue reading GEA Refrigeration LTD

Project: Alexion Pharma Energy Centre, Dublin September 2016 Cochran Ltd contracted HM to design, fabricate and install a 50M structural mast to support 4 off 700mm ID stainless boiler flu liners and 1 off high temp CHP 550mm liner. In addition to this we also fabricated and erected up to 170M of fully welded horizontal … Continue reading Cochrans

Project: Boots UK LTD 2 Off 250000 litre bunded diesel tanks CA Blackwell’s contracted Hartwell to design and fabricate and install 2 off 250000 litre bunded oil tanks for stand-by generators on their central distribution depot in Nottingham. The tanks were built to BS 799:5 Type J and were photographed above leaving our depot to … Continue reading CA Blackwell

Sign up to our newsletter for all the latest news and updates