GEA Refrigeration LTD

Project: SNF Chiller Plant Install August 2015

GEA contracted HM to install and fully pipe up a chilled water plant consisting of 2 BAC condensers, 2 off compressor packs and 2 off pump sets. The plant was free issued by GEA and HM was responsible for the lift and shift, incorporating the offload and positioning of the plant to the roof top and ground floor and the design, fabrication and installation of all connecting pipe work.

GEA supplied HM with a P&ID for the sizing and route. From this with careful site surveys and using 3D modelling software we were able to produce spool drawings which allowed us to fabricate 70% of the works offsite thus reducing the lead time for the client.

The project was completed ahead of programme and the client and end customer were extremely happy with the results.

Testimonial

Carl I have uploaded the completion photos from SNF site for distribution throughout GEA. Hartwell have done a great job and we look forward to utilising your services on future projects.

Robert Patrick
Senior Project Manager

Sign up to our newsletter for all the latest news and updates